Nowadays, most people buy houses that are only shells made of cement. The owners can decorate it to their own ideals. Today, we will take a look at the rough room wall treatment process. Only by mastering the overall process and correct specifications can we have a high-quality home. So what are the interior wall decoration steps ? Let's take a look! Interior wall decoration steps 1, check the wall Before all work can begin, we should also conduct an inspection of the entire body, mainly to see if the structure is strong and the appearance of the material is smooth. If there are problems, contact the developer or property in a timely manner and ask for a redo. If only a few holes are available, you can repair it yourself and use plaster instead. However, the flatness of the wall is poor (more than plus or minus 5mm), then you should consider making a gypsum leveling, and then test with the horizontal line, if not enough level, then you can require developers to redo. 2. Finished product protection After the repairs are basically completed, then there is also a preparation work, which is to protect the existing things, so as to avoid the pollution of dust, glue, and paint. In the convenience store, you can buy plastic paper or cardboard of suitable size to wrap the finished product that needs protection on the site, but be careful about the degree of shielding and avoid the possibility of damaging the finished product. 3, sealing layer processing Then entered the construction stage, first of all, the original wall surface of the seal, mainly to make up for gaps, slots, holes, use gypsum products, you can also use curing agent to do, or use a stronger curing ability Patch (kraft paper) to solve. However, there are several points to pay attention to: If the shovel shovels to the red brick, it is recommended to do cement plaster first, and then dry well after curing procedures; In addition, hydropower needs to be grooved in the wall, the first slot Filling with cement mortar is more difficult to achieve, so it is best to repair it with repair gypsum products. 4, putty First, to measure the flatness, to determine whether it is suitable for such construction, usually scrape twice, if the flatness is poor, then it should be scraped several times, the scraping interval should be more than 2 hours each time (after table dry ). 5, paint The previous steps are basically groundwork, and now we have entered the most critical process, that is, the coating. The first is the primer, which can be done in one go, but it should be done evenly before the next step can be carried out. Followed by a finish, usually two times, the interval time is 2-4 hours or more (based on dry paint finish), and the second pass should wait at least 1-2 days before it can fully dry out. This period should pay attention to waterproof, Drought-proof, sunscreen, prevent paint film problems. 6, acceptance All the constructions have been completed, but there is one key step, that is, the final result is checked. After the completion of the construction, the walls should be solid, flat, yin and yang cross vertical, no cracks, no holes, uniform color, full paint film , but also check the product protection. Summary: The above is Xiaobian made today for everyone with the knowledge of the interior decoration steps , I believe that my friends have a certain understanding, the interior wall decoration steps we can refer to, I hope this article is helpful to you. Industrial Aluminium Profiles,Aluminum Heat Sink Profile,Mobie Phone Base Aluminum Profile,Electrical Aluminum Extrusion Profile Guangdong Jihua Aluminium Co., LTD , https://www.jihua-alu.com