In life, water and electricity are indispensable to us and are essential for our lives. In the renovation, it is necessary to strictly control the construction of hydropower, and its safety and convenience are related to the comfort of everyone's housing. I believe that many people do not understand the hydropower construction plans . What we bring to you today is how to understand the hydropower construction plans and explain the symbols above. How to understand hydropower construction plans 1. Before looking at the hydropower construction drawings, you need to read the design specifications first, and look at the drawings according to the relevant standards above, so that you can understand the overall plan. 2. Look at the structure of the facilities in the drawings. Mark each code of the wall column and floor in the order of the drawings, and then calculate the ratio of the size of the drawings. 3. Take a comprehensive look at the plan, perspective, and section views of the construction site. Compare the site settings with the locations where the three-dimensional changes have occurred. In this way, things that are difficult to understand on the drawings will be understood more than half of them. 4. Finally, check and check again, and mark the shortcomings of the construction on the drawings. In this way, we can more easily understand the hydropower construction drawings. Detailed explanation of symbols on the hydropower diagram 1. The significance of various symbols on the drawings of hydropower The above is a detailed explanation of how to read the hydropower construction plan and the symbol on the hydropower diagram. After reading it, is there more understanding of the hydropower construction plan? In the renovation, you must know how to look at the hydropower construction plan. I hope the above introduction can help everyone. Hydropower Project Hydropower Design Home Improvement Hydropower Sealed Standoffs,Sealed Standoffs,Sealed Studs,Waterproof Fasterner,Water Resistant Studs Dongguan Tiloo Industrial Co., Ltd , https://www.sales-fastener.com
SC: welded steel pipe
PC: PVC polyethylene flame retardant plastic tube
CT: Bridge
MR: metal trunking
PR: Plastic trunking
WC: Dark Laying Along the Wall
WS(WE): laying along the wall
CC: Dark laying along the top plate
F: Concealed in the floor
CE: along the top plate
SCE: In the ceiling
YJV: Cable
SYV: TV line
PE: ground (yellow-green phase)
PEN: Zero (blue)
3 phase line (FireWire): Item A (Yellow) Item B (Green) Item C (Red)
KV: (Voltage) kV
BV: PVC single-layer plastic wire
BVV: PVC double plastic wire
MEB: total equipotential
LEB: Local Equipotential
2, line laying method code
PVC - laying with flame-retardant plastic tubes
DGL - laying with electrical steel pipe
VXG - laying with plastic trunking
GXG - laying with metal trunking
KRG - Laying with Flexible Plastic Pipes
3, line dark application area code
LA - hidden in the beam
ZA - dark inside the column
QA - dark in the wall
PA - hidden in the roof or ceiling
DA - hidden in the ground or floor
PNA - dark in ceilings that cannot be accessed
4, lighting installation code
D - ceiling
L - chain hanging
G———pipe hanging
B - Wall mounted
R———Embedded
BR———Installation in the wall
5, lighting fixtures marking method
a--Number of lamps
B--model or number
c - Number of light bulbs per lighting fixture
D--bulb capacity, W
E--bulb installation height, m
f--Installation
L - light source type, incandescent or fluorescent