Measuring Tape,Metric Tape Measure,Rolling Tape Measure,Metric Tape SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.equipmentool.com
GDL vertical multi-stage pipeline pump installation steps
Vertical multistage pipeline pump in the installation process should pay attention to what the problem? The correct installation method, not only can guarantee multi-level pipeline pump normal work, otherwise it will hinder the work, and even cause equipment damage, and today, Xiaobian here to GDL vertical multi-stage pipeline pump, for example, to introduce you to the multi-stage pipeline pump installation steps for your reference. GDL vertical multi-stage pipeline pump installation steps 1, the installation of pipe weight should not be subject to GDL-type vertical centrifugal pump, or vulnerable ring GDL-type vertical centrifugal pump; 2, multi-stage centrifugal pump Servo motor is the whole So the installation is very convenient; 3, before installing the pump should be carefully checked GDL multi-stage pump runner has no effect on the operation of the pump hard objects (such as stones, Iron sand, etc.) so as not to damage the pump over-current components during operation; 4, the installation must be tightened anchor bolts, and each interval in fact should check the pump during the passage to prevent its loosening, ; 5, in order to maintain the convenience and safety, install a regulating valve on the pump inlet and outlet pipelines and install a pressure gauge near the pump inlet and outlet, for high lift, in front of the outlet gate to prevent water hammer A check valve to cope with sudden power outages and other lost power accidents, so as to ensure that the pump running in the best conditions, increasing the life of the pump; 6, multi-stage centrifugal pump for suction occasion, should be equipped with a bottom , And the inlet pipe should not have too many corners, at the same time shall not have leakage, leakage phenomenon, so as not to affect the pump suction performance; 7, in order to prevent impurities from entering the pump blockage flow channel affect performance, should be in front of the pump inlet Install the filter; 8, before installing the rotor components of the pump rotating pipe should be no friction sound or stuck phenomenon, or the pump should be opened to check the reasons. Extended reading: "Industry Leader" magazine This article belongs to Industrial Internet (Xiamen) Technology Co., Ltd. All are welcome to reprint, please indicate the author and source. Author: Asian pumps Network Editor: Yue Lijuan (QQ / micro letter:) starting: http: //beng.liuti.cn/ (service hotline:)