Experts advise the new house decoration attention section acceptance

Check before acceptance to see whether the demolished and reformed project is in accordance with the contract, whether there are hidden safety hazards, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with those agreed in advance.

Acceptance of water circuit <br> The acceptance of the second stage should be a single acceptance of waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable and the operation is normal under the operation of professional hydraulic or electrician. , and reconfirm the actual size of the line transformation. Only after the line is changed, the putty worker can continue to seal the wall and putty. Carpentry work size inspection according to drawings
The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the various parts, if found inconsistent place, promptly prompt the construction team to modify.
Carpentry work quality acceptance
When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.
Oil work quality inspection
After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.
Acceptance after Completion <br> The acceptance in the final stage is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, the construction team should be required to clean the room thoroughly before being removed.
The acceptance stage is not absolute in the actual construction. Different families have different requirements for the decoration content, and the construction progress will naturally have corresponding adjustments, which can be flexibly controlled according to the progress of the project.

Three trees paint entrance decoration room paint home decoration paint bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size

Small Coil Wire

Small Coil Wire

Small coil wire is a reprocessed product from black Iron Wire, galvanized wire and PVC Coated Wire. The small coil wire with many features such as small coil size and weight, easy carrying and using, saving labor and improving efficiency is widely used for industrial sites as binding wire. In addition, sizes of small coil wire are various and can be customized on customer's request.

Small Coil Wire,Electro Galvanized Small Coil Wire,Hot-Dipped Galvanized Small Coil Wire,Pvc Coated Small Coil Wire

HENGSHUI YUZHENG IMPORT AND EXPORT CO., LTD. , https://www.yuzhengnails.com