In the process of demolishing the structure of the original building, it is necessary to dismantle the original old site building and retain the strength of the structure. This makes the original impact drill and other demolition techniques useless, because the impact drill such removal tools will inevitably have an impact on the retained structure, affecting the service life. Faced with this problem, a new technology was first used in the construction of such a large stadium. The builders used advanced diamond static cutting technology to reduce the noise and dust. The construction team used diamond tools to grind the reinforced concrete under high-speed operation, and the generated dust was taken away by the cooling water to form a cutting surface. To put it bluntly, the original stadium was cut with a diamond knife, and the reservation was retained and removed. This new technology has no deafening noise like traditional impact drills, and it has no pollution, no vibration, does not affect the strength of the original structure, achieves the purpose of nondestructive demolition, and adopts a shuttle-shaped visor system and municipality during the construction process. Measures such as the China Water System reflect the concept of “Green Olympicsâ€.
Diamond static cutting technology applied to the Olympic reconstruction and expansion project
The reconstruction and expansion project of the Olympic Sports Center Stadium highlights the three concepts of “Green Olympics, Science and Technology Olympics, and Humanistic Olympicsâ€.