Cabinet assembly definition Assembled cabinets, including cabinet panels, panels and floor panels, are characterized in that the cabinet bodies have at least two vertically oriented cabinet panels, each cabinet panel being connected by a pull rod extending through the cabinet panels, and the cabinet panels are placed in the cabinets On the body board, the bottom board is placed on the pull rod at the lower end of the cabinet board, and the back board is sealed to form a assembled cabinet. The utility model has the advantages of simple structure, easy manufacture and disassembly, and no need for the connection of iron nails between the cabinet plates. Cabinet assembly acceptance 1, the way of assembly 2, whether the cabinet junction is tight 3, the structure is more stable, firm and not easily deformed The common problems of cabinet assembly and solutions Whether the technology is advanced, such as: if the wood has been heat-treated, the degree of evaporation of water and the degree of deformation in the future; Whether the production is excellent, whether there is open glue or cracks, and the finish is good or bad, especially whether the joints (glued or nailed) are firm, whether they are smooth, and whether the clearance gap is aesthetically pleasing, etc. Cabinet construction technology Cabinet assembly: 1. When the cabinet is assembled, the jaws of the vertical plate shall be on the front, the jaws of the horizontal plate shall be on the opposite side, and the jaws shall be squared; before assembly, all the structural plates shall be deburred with sandpaper. In the cabinet frame, the top plate must be pressed against the vertical plate to avoid loosening when the sliding door is pushed and pulled. 2. Before installing the backplane, check whether its diagonal line is equal, and ensure that the backboard color is the same in the cabinet body. The backplane should use five plywood or nine plywood. After the cabinet is assembled, the overflowing latex in the cabinet should be cleared immediately. And pencil marks. 3. If the back of the cabinet is inlaid with tiles, use a large core plate as the back plate, and then seal a layer of “Ete board†waterproof plate (silica calcium plate), and then hang the wire mesh powder cement mortar to prevent the wood mold from moisture and mildew. . 4, if the cabinet backplane is five PCT board, behind it must use two 100mm large core slats laterally fixed. Cabinet construction specifications 1. Press plate: According to the design requirements, the 5mm small core plate and 15mm large core plate are subjected to cutting. According to the position of the cabinet structure, the 15mm big core plate is single-sided or double-sided, and the 5mm plate is single-sided. The Baoli plate is made of white latex. Paste, place and place on the pressure platform, pressurize the weight; 2. Assembling: Natural or heat drying for more than 7 days. When there is no glued planer floor, according to the design requirements, the 15mm board will be facing the 2.1CM card slot, and the cabinet frame will be assembled according to the card slot; To install a drawer, the drawer accessories must be installed first; after the assembly is completed, the 5mm plate is connected to the cabinet body with a headed nail; at the same time, drawers, partition boards, etc. can be made according to design requirements; 3. Fixation: After the kicking part of the cabinet body is manufactured according to the design requirements above, it is fixed on the ground with the auxiliary inner panel, and the assembled cabinet body is placed on the kick frame, and the straight nail is used for the oblique hitting method. Fix the cabinet and the kick frame, and fix the upper baffle of the cabinet to the sky surface and the cabinet according to the design requirements and the actual height of the room; 4. Forming: After the cabinet is fixed, there are, and then paste the veneer, solid wood lines and the cabinet body with the white latex pattern nailing method; and wait until the glue is fully dried before installing the door hinge, installing the door leaf to install the drawer, compartment Board etc. Decoration Construction Knowledge Carpentry Knowledge Cement Drawer Tile Glue
We are a professional manufacturer of hydraulic accessories for crawler excavators Professionally provided aftermarket customers with various brands of crawler Excavator Final Drive, Travel Motor , Travel Gearbox, Swing Device , Swing Motor ,Swing Gearbox,hydraulic pump, main Control Valve and other accessories.Strictly controlling the quality acceptance of each product Standards to ensure high-quality qualified export of each product.At the same time, we can customize the production services of the products through the drawings according to customer needs, and make every effort to make the perfect product in the mind of each customer.
1.How can I get the price? Small Hydraulic Cylinder,Telescopic Hydraulic Cylinder,Excavator Bucket Cylinder,Excavator Arm Cylinder Jining Juheng Hydraulic Machinery Co., Ltd. , https://www.jhexcavator.com
-We usually quote within 24 hours after we get your inquiry(Except holidays).
2.What is your lead time?
-It depends on the order quantity.
Usually we can ship within 3-10 days for small quantity,and about 30 days for large quantity.
3.What is your payment term?
-T/T,PAYPAL,Bank Card,apple pay,google pay,etc.
4.What is the shipping method?
-It could be shipped by air.Support DHL,FEDEX,UPS.
And we can deliver it to your agent in China for free if you have one.
5.What is MOQ?
-1 piece at least.More order more discount.
6.What is the warranty term?
-We promise 16 months warranty,
provide technical help or new product replacement(quality issue).
If you want to know more about our products in more detail, please click on the product details to see more information about product quality, price, packaging, transportation, etc., or you can directly click on Contact Now on the page to talk to us directly. Looking forward to starting long-term business cooperation with you!