Introductory Raiders: The process of renovating the house Yulin "rookie" speed onlookers

House decoration refers to the behavior of excavating walls, floors, moving window positions, demolition and modification of load-bearing or non-load-bearing structures, addition of house separation structures, improvement of the appearance of houses, and decoration of interior layouts. Decoration is divided into two parts, interior decoration and outdoor decoration. Owners who purchase a house for the first time will often be confused about where to start the renovation . If you do not understand the process of renovating the house , you will be in a hurry and you will also spend a lot of money. Don't worry, in order to help you further understand the process of renovating the house , I have put together a process for the most complete renovation of the house in history. I hope to help friends who have this need!

The process of decorating the house

(I) Pre-design

In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link."

In the early design, one thing that must be done is to make a detailed measurement of your own room. The contents of the measurement mainly include:

1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. Remind everyone, do not forget to go to the property before the start of construction formalities, pay a decoration deposit.

(II) Demolition of the main body

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade wall, change steel window and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

(III) Hydropower Reform

Before the transformation of the water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition, the first measurement of cabinets should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. mainly include:

1. Check if the position of the socket outlet affects the installation of the hood in the future;

2, see if the location of the water meter is appropriate;

3, to see if the position of the inlet is convenient for installing the sink later.

After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

Some owners have always thought that before the renovation began, some main ingredients should be advanced. What I want to say is that, unless it is the main material needed for the demolition of the main body, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if the tile or large core board is improperly positioned, it is troublesome for the workers to move in and out.

(d) Woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement. I will mention it later.

In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Coordination, such as I mentioned before, “If a home is going to be a false wall, consider whether there are hydropower lines on the false wall. If there are, the hydropower reform workers should be buried.”

(five) tiling

If the workers are too busy, the foreman will normally allow the bricklayer to enter the tiling when the “wooden boss” is not over. This is normal, because there is no conflict between the two.
In the process of “bricklayer”, the following three steps are also involved:

1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.

2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when the students started to visit the building materials, they should buy land drains as early as possible.

"The bricklayer's second cousin" leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the kitchen tiles are finished, the cabinet can be measured for the second time.

(six) brush wall paint

The “oil worker's third child” entered the field and mainly completed the work of basic wall surface treatment, brush finish, and painting of furniture hit by the “wooden boss”. To prepare wallpapers for students, you only need to let the “oil worker” in the plan to do wallpaper on the wall. As for whether or not to stay in the paint for the last time, I personally feel that this problem is not necessarily too true. From the experience of my renovation, the significance of leaving the paint once again is not great, because the operation behind it is no more messy than painting. . When the “boss”, “second child” and “third child” have left the court one after another, many owners will think that their decoration is almost over. In fact, if the number of links is counted, one-third will not be enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration.

If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "package" our home, and really say that "home-made" homes are almost all in the "installation phase."

  

(7) Water heater installation

Wall, floor decoration can be informed after the water heater delivery, installation. Water heater installation is generally in the ceiling before, gas water heater has become the current trend, generally installed in the kitchen or closed balcony, if it is electric water heater, then installed in the bathroom.

(8) Kitchen ceiling

After the water heater is installed, the next step is the ceiling. Kitchen and bathroom ceiling as the installation of the head, or continue the home of "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is generally equipped with kitchen ceiling lamps and exhaust fans (Yuba).

(9) Cabinet installation

After the ceiling is over, the cabinet door can be installed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.

(10) Installation of hood machine

The installation of the smoke stove should be arranged on the same day as the cabinet installation to facilitate the coordination of the master chefs.

(11) Door installation

On the second day of cabinet installation, as soon as the wooden door measurement was completed more than one month ago, it is now possible to install it. The hinges, door locks, and suction are installed at the same time as the door is installed. The production period of solid wood doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the size of door openings as soon as possible after the completion of main body demolition. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, the workers need to be treated as if they are equal in height - good-looking.

(12) Floor installation

The floor can be installed on the second day after the wooden door is installed. The following issues need to be noted in the floor installation:

1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, some decoration companies or renovation teams will recommend students leveling or local leveling, to the actual survey of the floor manufacturers prevail;

2. Before the floor is installed, the floor of the home's paving floor should be cleaned and the ground must be kept dry. Therefore, do not use water during the cleaning process.

(13) Paving Wallpaper

On the second day after the floor is installed, the home is cleaned and the wallpaper can be pasted. If it goes well, it's the same time of day. If conditions permit, on the day of paving the wallpaper, the floor should be protected; if it is not conditional, it is okay to clean the leftover wallpaper glue on the floor to the original cleaning. Before paving the wallpaper, try to "don't have anything" on the wall.

  

(14) Switch socket installation

In the bathroom, all sockets and switches must be waterproof and the sockets must be covered. The light switch at the entrance is recommended to use induction or fluorescent type.

There should not be too many switch sockets, and at least one socket should be left where the sockets are arranged. It should be noted that there will be more and more household appliances. Once there are new appliances but no outlets, it is difficult to install them.

(15) Lighting installation

Loading lights, nothing to say. After the lights were installed, the home was bright and bid farewell to the dazzling glare of the 100-watt incandescent bulbs during the renovation - it felt good.

(16) Hardware Ware Installation

Before buying good plumbing, bathroom accessories, toilets, drying racks, etc., they are all installed. After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon's water and watched the flow of the water “squeaking and squeaking”, it would be beautiful in your heart; for the first time in your newly installed toilet, you would have a great sense of accomplishment.

(17) Curtain rod installation

The installation of curtain rods marks the end of home improvement. You can take a sigh of relief, and the days of busy dark days are finally dawning.

(18) Pioneering cleaning

Before the pioneering cleaning, do not install curtains. When the pioneers are cleaning, there should be no furniture and unnecessary appliances in the home. Try to maintain more “flatness” so that the pioneering cleaning can be thoroughly cleaned.

(19) Entry of furniture

With regard to the purchase time of furniture, my suggestion is that after the completion of the transformation of the water circuit at the earliest, the basic size range of the furniture we choose is only a few. Therefore, some students have already rushed to set the furniture before the decoration has begun. Personal feeling is not necessary.

(20) Appliances entering the field

At this time, the entrance of the appliance to enter the field, the installation of the installation, ready to stay!

Editing summary: The above is the introduction of Raiders: the process of renovating the house Yulin "rookie" related to the rapid onlookers, hoping to help meet the needs of friends! For more information, please continue to pay attention to our website, follow-up will show more exciting content. You can also purchase more of your favorite products on Qijia Mall!

Own decoration house flow house decoration effect drawing 120 house renovation house renovation

Aluminum Coated Coil

Aluminum Coil,Aluminum Coated Coil,Aluminum Roofing Material,Prepainted Aluminum Coil

SHAOXING YOTO IMPORT&EXPORT CO., LTD , https://www.sxyotoes.com